It is important to gain an early understanding of all potential on-site constraints, not all of which are visible or immediately apparent.
We can carry out consultations with various bodies that operate overground and underground utilities, to determine whether there is the potential for a proposed wind farm to interfere with their operations.
We will liaise with any affected link operators to negotiate clearance zones that mitigate any potential issues, and ensure that the developer has the best chance of proceeding with their preferred layout and design.
Please have a look at the following pages to find out more about these services.